Updated Articles

  1. Load Data into RAMM

    Step 1 Step 2
  2. Check Data

    Step 1 Step 2
  3. Prepare & Check Equipment

    Step 1 Step 2 Enough time needs to be allowed for any required equpment callibration prior to the start of the survey 
  4. Network Road Roughness Survey Process Introduction

    Purpose To describe the steps for carrying out a road roughness survey Process Owner Inputs Outputs Systems Involved Last Updated Procedure steps ........ ...
  5. Adding Traffic Counts to RAMM

    RAMM Notes and Assumptions Indicative (draft) Data Dictionary Other Supporting Links RAMM has a MetroCount import tool. There are supporting configuration files available to help export data from the MetroCount applicatio...
  6. Orientation

    This is a Custom Content Category. These categories have the same editor as an article, but they display as categories in the Table of Contents and navigation, and they can still contain other articles.
  7. Get started

    This is a Custom Content Category. These categories have the same editor as an article, but they display as categories in the Table of Contents and navigation, and they can still contain other articles.