-
Last Updated: 05/02/2025
in Work Instructions
Purpose In preparation for monthly project monitoring beginning in February 2025, it is important that all of the projects that need to have a monthly report are entered in the AWM System. Roles and Res...
-
Last Updated: 05/02/2025
in Work Instructions
Task As part of the roll-out of the AWM system, the structures within the system must be reviewed and validated to ensure that: An accurate picture of the total structure asset base on the network and their locations That the basic details o...
-
Last Updated: 05/02/2025
in Work Instructions
Task As part of the roll-out of the AWM system, the network within the system must be reviewed and validated to ensure that: It provides an accurate spatial representation of the national road network That the details of the network such as ro...
-
Concrete Defects Concrete members can be used in three forms for bridge construction as stated below: Plain Concrete Reinforced Concrete (Cast in-situ and precast) Pre-Stressed Concrete (Post-Tensioned mainly) Safety Concerns – The major ...
-
The intention of this Annex A is to introduce the taxonomy and terminology used in bridge management field. Force External Influence on an object that tends to produce a change in its shape or cause movement. Compression ...
-
In addition to data collection, inspections must include photographing the main elements and damages, starting with the most critical ones. It is recommended to take photographs in the same sequence as the condition inspections, beginning with gen...
-
The protection and safety of experts and environment are the essential on every work site and should be prioritized at all times during field operations. Working on or near roads is extremely hazardous and the following rules must be observed by ...
-
The use of a “safety” Smart Flag must be used if, in the opinion of the Inspector, a defect impacts the integrity of the structure to such a degree that the safety of the public or structure are jeopardised. The addition of a smart flag and dete...
-
1. Roadway and Deck Elements The inspector should check: The pavement for unevenness, settlement, or roughness (shown below). Shoulders, slopes, drainage, and the approach guardrail. The deck and sidewalks for various defects, noting the si...
-
Last Updated: 28/01/2025
in Work Instructions
Collection of Inventory Information Bridge inventory information can be collected at office or during inspections, which are commonly carried out after construction or reconstruction of a bridge but can also be done directly before condition as...