Articles

Network Validation - Work Instruction
Task As part of the roll-out of the AWM system, the network within the system must be reviewed and validated to ensure that: It provides an accurate spatial representation of the national road network That the details of the network such as ro...
Road Structures Validation - Work Instruction
Task As part of the roll-out of the AWM system, the structures within the system must be reviewed and validated to ensure that: An accurate picture of the total structure asset base on the network and their locations That the basic details o...
Collection of Inventory Information - Work Instruction
Collection of Inventory Information Bridge inventory information can be collected at office or during inspections, which are commonly carried out after construction or reconstruction of a bridge but can also be done directly before condition as...
Project Monitoring Preparation - Work Instruction
Purpose   In preparation for  monthly  project monitoring  beginning in February 2025, it is important that  all of  the projects that need to  have a monthly report are  entered  in the AWM System.     Roles and R...
Monthly Project Monitoring - Work Instruction
Purpose   From February 2025  monthly  project monitoring will be carried out in the AWM system. I t is important that the relevant provincial staff understand their roles and responsibilities, and have the knowledge necessary to ...
Project Validation - Work Instruction
Is there missing reference IDs that could be added? For example, if you are using an ID in your other reporting lines, can we use this in the system? Such as PIP.  Is the Type of Work correct? Is the Project Status correct? For example...