Viewing information in Map and Grid Select Menu in the top left corner. To find assets and other information you can click on the ‘Asset and Inventory’ icon in the list or search directly for what you require. Search for the asset data as p...
-
System Name: Asset & Work Manager (AWM) - formerly called RAMM Software Company: ThinkProject New User If you are a new user, you will need to be issued with a login. Request a login by contacting support@pngroads.com . You will need to in...
-
Created On: 10/12/2024
in Systems Microsoft365
Open Mircosoft Teams Search for ‘Microsoft Teams’ using the search function on the bottom left corner of the screen. Click on the Microsoft Teams application. Select the Calendar tab Click on the Calendar tab on the far left hand column....
-
In this article, we will show you how to add a Project record into the AWM System. Step-by-Step Guide Video The video below provides a detailed walkthrough and the article includes a step-by-step guide. Your browser does not support HTML5 v...
-
Concrete Defects Concrete members can be used in three forms for bridge construction as stated below: Plain Concrete Reinforced Concrete (Cast in-situ and precast) Pre-Stressed Concrete (Post-Tensioned mainly) Safety Concerns – The major ...
-
The intention of this Annex A is to introduce the taxonomy and terminology used in bridge management field. Force External Influence on an object that tends to produce a change in its shape or cause movement. Compression ...
-
The use of a “safety” Smart Flag must be used if, in the opinion of the Inspector, a defect impacts the integrity of the structure to such a degree that the safety of the public or structure are jeopardised. The addition of a smart flag and dete...
-
The protection and safety of experts and environment are the essential on every work site and should be prioritized at all times during field operations. Working on or near roads is extremely hazardous and the following rules must be observed by ...
-
In addition to data collection, inspections must include photographing the main elements and damages, starting with the most critical ones. It is recommended to take photographs in the same sequence as the condition inspections, beginning with gen...
-
Created On: 07/11/2024
in Work Instructions
Collection of Inventory Information Bridge inventory information can be collected at office or during inspections, which are commonly carried out after construction or reconstruction of a bridge but can also be done directly before condition as...