-
In this article, we will show you how to add a Project record into the AWM System. Step-by-Step Guide Video The video below provides a detailed walkthrough and the article includes a step-by-step guide. Your browser does not support HTML5 v...
-
Last Updated: 04/03/2025
in RMS Data Standard
-
Concrete Defects Concrete members can be used in three forms for bridge construction as stated below: Plain Concrete Reinforced Concrete (Cast in-situ and precast) Pre-Stressed Concrete (Post-Tensioned mainly) Safety Concerns – The major ...
-
Last Updated: 13/02/2025
in Data Collection
-
This article provides guidance on how to edit projects (and associated contracts) in the AWM system. Step-by-Step Guide Video In this video, using an example, we demonstrate how to edit a project record. Your browser does not support HTML5 vi...
-
RAMM Table : Carriageway Attribute: Carriageway Type Purpose: To provide road categorisation that identifies different types of road sections (carriageways) that allow analysis to report on dual carriageway, roundabout...
-
Last Updated: 11/12/2024
in RMS Data Standard Road Network
A register of all Roads (including Highways) is maintained in the RAMM Road Name ( roadnames ) table. The AWM Road Name table can be accessed from the AWM Menu. The Road Name table contains information about the road name records, includi...
-
Last Updated: 05/02/2025
in Work Instructions
Task As part of the roll-out of the AWM system, the structures within the system must be reviewed and validated to ensure that: An accurate picture of the total structure asset base on the network and their locations That the basic details o...
-
RAMM Table : Carriageway Attribute: Hierarchy Purpose: To provide road categorisation that represents the hierarchy of the road section (carriageway) as set out in official policy and / or strategies. Value De...
-
The Monitoring Officer is the person responsible for collecting data for the project. In most cases this will be the Project Engineer who is also responsible for collating data for the fortnightly project report. If the project is at a Plannin...