-
-
Last Updated: 28/05/2025
in Systems
-
The Monitoring Officer is the person responsible for collecting data for the project. In most cases this will be the Project Engineer who is also responsible for collating data for the fortnightly project report. If the project is at a Plannin...
-
1. Roadway and Deck Elements The inspector should check: The pavement for unevenness, settlement, or roughness (shown below). Shoulders, slopes, drainage, and the approach guardrail. The deck and sidewalks for various defects, noting the si...
-
Article Purpose To provide specification on a safe and standard method for collecting bridge condition data using Open Data Kit (ODK) data collection systems. Intended Users Anyone who is responsible for setting up or carrying...
-
Finding a road or location on the network The search bar in the top right corner of the map allows you to quickly jump to specific locations on the map. There are four ways to use the bar (all examples are using Waigani Drive at the main entr...
-
AWM Table : Bridges Attribute: Parapet Type Purpose: To identify the type of parapet used on a bridge, which helps assess safety features, containment capability, and maintenance needs. Parapets provide edge protection...
-
Purpose: To group rivers by type (like straight, meandering, or steep) so we can plan, maintain, and report on them more accurately, Value Description Photo Example Braided A braided river is a type of river channel that consists of...
-
-
AWM Table : Bridges Attribute: Parapet Material Purpose: To record the material used for bridge parapets, which helps assess durability, safety performance, and maintenance requirements over time. Value De...