-
AWM Table : Bridge Attribute: Abutment Bank Protection Purpose: To identify the type of protective structure used around abutments to prevent erosion or scour from water flow. This supports the maintenance and safet...
-
It should be noted that AWM was previously referred to as RAMM. Thinkproject have created an in-depth (40+ page) step-by-step guide on how to use AWM filters. This guide can be downloaded here Filtering in RAMM.pdf . The guide covers the con...
-
AWM Table : Bridges Attribute: Analysis Method Purpose: To record the level of assessment applied to the road or structure, helping users understand the reliability and detail of the information used for planning, des...
-
To apply a filter to an asset table based on information in the carriageway table (such as province or sealed/unsealed network) the following steps should be followed (note that this article outlines how to apply a filter for province – if you wan...
-
-
Last Updated: 07/04/2026
in Asset Data RMS Data Standard
-
This article demonstrates how to adjust the dimensions for a record. This may be needed when the actual length drawn is different from the calculated length (end location - start location) for the record. This is expected for records that either a...
-
While we want to add progress and issues photos to the project and contract monitoring records, you might want to also add some photos to the Project and Contract records to show some significant before and after photos, and documents such as the ...
-
All information and screenshots in this article have been sourced and reproduced from the metrocount.com website. Please note the screenshots used in the article are generic only, and are not specific to the Papua New Guinea road network. The ...
-
The Approving Officer is the person responsible for signing off on the report to state that the information is accurate to the best of their knowledge. In most cases, this will be the PWM, but they may delegate this role to a PCE for example. I...